Detail List of Environment Protection Information Disclosure of Enterprises and Public Institutions
Filled by: Yunnan Daphne Pharmaceuticals Co., Ltd.
Head of Unit (Signature): Luo Jinming
Date of Filled and Submitted: March 9, 2016
|
Basic information |
Name |
Yunnan Daphne Pharmaceuticals Co., Ltd. |
||
|
Organization Code |
21817219-8 |
Legal Representative |
Luo Jinming |
|
|
Business Address |
Wenshan Panax Notoginseng Industrial Park |
Telephone |
86 876-2139227 |
|
|
Business Scope, Products and Scale |
The company produces Chinese patent medicine and preparations. It produces 116.8 tons of Panax Notoginseng extract and 640 tons of Panax Notoginseng medicinal slices each year. It can produce 1000 million tablets, 600 million capsules, 80 million bags of granules and 40 million bags of powder each year. Its products include Panax Notoginseng Saponins, Qishengli Tablet, Qishengjing Tablet, Panax Notoginseng Capsular, Danshen Yixin Capsular, Tiaojin Yangyan Capsular, Sanqi Shangyao Tablet and Qiye Shen’an Tablet. |
|||
|
Discharge information |
Major Contaminants and Features, Names of the Contaminants, Discharge Method, Contaminant Concentration and Amount |
The major contaminants are sewage, waste gas and waste residue. 1. Sewage. the total discharge amount is 12150m3/year. Discharge concentration of COD is 35.71mg/L. The discharge amount is 3.47tons/year; the discharge concentration of BOD is 18.05mg/L. The discharge amount is 1.75tons/year. The discharge concentration of suspended solids is 13mg/L. The discharge amount is 1.23tons/year. The discharge concentration of ammonia nitrogen is 0.54mg/L. The discharge amount is 0.053 ton/year. The sewage is discharged into the municipal sewage pipe network after treated in the sewage treatment station. 2. Waste gas. The total discharge amount is 9703 ten thousand cubic meters. The soot discharge concentration is 31.88mg/m3; the discharge amount is 1.598 tons/year. The discharge concentration of sulfur dioxide is 79mg/m3. The discharge amount is 3.938 tons/year. The dust discharge concentration is 6.68mg/m3; the discharge amount is 0.019 ton/year. The waste gas is discharged after cyclone dust removal and water curtain dust removal. 3. Waste residue. The total discharge amount is 300t/a. The waste residue is taken by Wenshan Jinchuan Biofertilizer Co., Ltd. to manufacture biofertilizer. (Note: the data is from 2015 Annual Report of Discharge Inspection). |
||
|
Number and Distribution of the Discharge Outlets |
经度:104 0 14 ′39 ″,纬度:23023 ′26″ One sewage discharge outlet at the sewage treatment station of the company; three waste gas discharge outlets, one in the boiler workshop and two in the extraction workshop. Longitude: 104 0 14 ′39 ″ Latitude: 23023 ′26″ |
|||
|
Contaminant Discharge Standard Implemented and Approved Discharge Amount |
Water Quality Standard for the Sewage Discharged into the Municipal Sewer (CJ343-2010) is applicable for sewage. Schedule 1 of Emission Standard of Air Pollutants for Boiler (GB13271-2001) is applicable for the waste gas. 1. The allowed discharge amount of sewage, COD, BOD, suspended solids, ammonia nitrogen, soot, sulfur dioxide and dust is 14.1 ten thousand m3, 42.3m tons, 21.15 tons, 2.79 tons, 0.705 ton, 7.2 tons, 21.6 tons and 0.168 ton each year, respectively. |
|||
|
Construction and Operation of Pollution Prevention Facilities |
Name of the pollution prevention facilities: one sewage treatment station Construction unit: Kunming Taixu Environment Protection Engineering Co. Ltd. Investment: RMB 120 ten thousand Yuan Operation situation: normal |
|||
|
Environmental Influence Evaluation and the Procedure of “Three Meanwhile” |
1. Technical Transformation Project of 60 million Qishengli and Qishengjing Tablets. Commencement date: April 2003. Pilot production date: September 2004. Audit authority of the report, document number and date: Yunnan Environment Protection Bureau, Y. H. J. B. [2003] No. 41. Aug. 1, 2003. Construction unit of environment protection: Yunnan Yinfa Environment Protection Co., Ltd. Date of acceptance inspection: Nov. 25, 2004. Acceptance inspection document number: W. H. Y. [2004] No. 5. 2. Nonlocal Technical Transformation Project of Panax Notoginseng Health Food, Food and Liquid Beverage Production Line. Commencement date: 2005. Pilot production date: March 2006. Audit authority of the report, document number and date: Environment Protection Bureau of Wenshan Prefecture, July 12, 2003. Date of acceptance inspection: Jan. 28, 2007. Acceptance inspection document number: W. H. Zi [2007] No. 30. 3. Technology Improvement of Integrated Production Line of Panax Notoginseng - Panax Notoginseng Processing Center Project. Commencement date: Dec. 20, 2008. Pilot production date and approval: Oct. 26, 2010, W. H. S. [2010] No 180. Audit authority of the report, document number and date: Yunnan Environment Protection Bureau, Y. H. X. Z. [2008] No. 312, Nov. 16, 2008. Construction unit of environment protection: Kunming Taixu Environment Protection Engineering Co., Ltd. Date of acceptance inspection: Aug. 7, 2012. Acceptance approval: Y. H. Y. [2012] No. 61. |
|||
|
Emergency Plan for Emergent Environmental Incident |
The Company has compiled the “Emergency Plan for Emergent Environmental Incident of Yunnan Daphne Pharmaceuticals Co., Ltd”. |
|||
|
Others |
|
|||